AI Content Chat (Beta) logo

Annex 5: Activity Standards for Local Gravel Road Maintenance 560 VI. Maintenance Method VII. Method of Measurement Measurement of drainage structure cleaned will be made by actual count of the total number of units of each type acceptably completed. VIII. Basis of Payment The quantities as provided in the Method of Measurement shall be paid for at the contract price bid per unit (line), which price and payment shall be full compensation for cleaning, disposing of debris and the provision of necessary tools. IX. Payment will be made under:

LRM Manual CMGP - Page 560 LRM Manual CMGP Page 559 Page 561