AI Content Chat (Beta) logo

Local Road Management Manual 548 V. Daily Production Rate 50 - 100 shoulder meters repaired (full width or partial width) VI. Method of Measurement The shoulder-meters repaired to be paid, shall be the length of shoulders in meters which has been cut, fill, compacted and accepted by the Engineer. VII. Basis of Payment The quantity of completed repaired and compacted shoulders as provided above shall be paid for at the contract unit price per meter. Payment shall constitute full compensation for cutting, filling, compacting of the road surface and for supplying all labor, equipment and tools to complete this work item, including the required traffic control. VIII. Payment will be made under:

Local Road Management Manual Page 548 Page 550