152 SHANLEY ST Location: 152 Shanley St., Kitchener, ON Course: AE325 - Project 1 Studio Duration: 3 Months Responsibilities: Research, Space Planning, 3D Modeling & Rendering Original Rainwater Harvesting Oneoftheearliest Reduce water consumption iterations from the massing by harvesting rain for stage. non-potable water uses. L-shape GreenTerraces Overall shape changed to Communalgreenspaces L-shape to better allow sun addedtoupperfloors. light into building core. SunShading Horizontal louvres added on South side to reduce direct sunlight into building. 14
Portfolio 2024 Page 13 Page 15