AI Content Chat (Beta) logo

Local Road Management Manual 553 V. Daily Production Rate 2 - 4 shoulder km. Graded VI. Method of Measurement The quantity of graded shoulder to be paid, shall be the number of shoulder-kilometers which has been cut, graded, compacted and accepted by the Engineer. VII. Basis of Payment The quantity of completely graded and compacted shoulder as provided above shall be paid for at the contract unit price per kilometerconstitute full compensation , which price and payment shall for leveling, grading, shaping, compacting and watering of the surface and for all labor, equipment, tools to complete this item, including required traiffc control. VIII. Payment will be made under:

LRM Manual CMGP - Page 553 LRM Manual CMGP Page 552 Page 554