Annex 5: Activity Standards for Local Gravel Road Maintenance 544 ii. Restore shape of roadway surface. iii. Place material in layers to facilitate compaction. iv. Compact each layer. v. Shape surrounding surface or dig outlet channels through high areas of surface, if needed, to allow water to drain the ditch. Report said high areas to PRMF Provincial Coach and Provincial Engineer for scheduling of needed corrective action. vi. Check cross-section, proifle and drainage. Rework if needed. vii. Remove safety devices. V. Daily Production Rate 80-120 cubic meters of patching material placed. VI. Method of Measurement The quantity of machine patches of road to be paid shall be the total cubic meters of materials which have been consumed and accepted by the Engineer. VII. Basis of Payment The quantity of surface course materials determined as provided above shall , which be paid price and for at the contract unit price per cubic meter payment shall constitute full compensation for providing, transporting, placing, compacting and watering of the surface course materials, for the preparation of the base and rectiifcation of any irregularities and depressions and for all labor, equipment, tools to complete the item, including required traiffc control. VIII. Payment will be made under:
LRM Manual CMGP Page 543 Page 545