Local Road Management Manual 219 Table 7.6 Penetration Patching Bituminous Pavements Purpose To provide smooth, well-drained surfaces. This activity is not suitable for repairing hazardous conditions, since lack of mobility prevents quick response. Procedure 1. Remove standing water, if any, from the defects. 2. Shape defects so that; (a) depth provides for suiffcient strength; (b) sides are vertical; (c) corners are squared or slightly rounded; (d) sides have no abrupt changes in line; and (e) hole is cut back. 3. Add base material if needed. 4. Place aggregate in layers and compact each layer. 5. Penetrate ifnal layer with asphalt. Avoid using too much asphalt. 6. Apply cover sand and compact. Final layer should be lfushed with surrounding surface. 7. Dig channels through shoulders, if needed, to allow water to drain. 8. Check cross section, proifle and drainage. Rework if needed. 9. Notes • Penetration macadam is suitable for regions without asphalt plant. • After placing and spreading macadam aggregate, oversize and slender or lfat aggregate should be removed. • Bituminous material should be spread uniformly so as to penetrate suiffciently and cover aggregate. • Seal coat surfaces to keep water tightness.

LRM Manual CMGP - Page 219 LRM Manual CMGP Page 218 Page 220