AI Content Chat (Beta) logo

Local Road Management Manual 386 Example: (Assessed over total carriageway area of segment) In the first 100m of a segment there is 1 shattered slab, in the second 100m segment there are no shattered slabs. There are 2 shattered slabs in the third 100m segment. These shattered slabs will be recorded as follows:

Local Road Management Manual - Page 387 Local Road Management Manual Page 386 Page 388