AI Content Chat (Beta) logo

Chapter 3: Local Road Planning 79 Table 3.5 Typical Pavement Distress of Portland Cement Concrete Pavements (PCCP) Distress Type Major Causes Common Repair Method B.1 Shattered Subgrade and/or base Full depth repair (slab Slabs failure, lack of dowel bars replacement) (load transfer problem), insufficient pavement thickness, base and subbase settlement, substandard concrete quality B.2 Scaling Over-finishing, improper Slurry seal, skid resis- curing, unsuitable tance treatment, AC aggregates, chemical overlay action. Substandard concreate mix B.3 Cracking: B.3.1 Corner Traffic loads on Crack sealing, remove cracks unsupported corners, spot and replace weak subgrade/base B.3.2 Diagonal Traffic loads on cracks unsupported slab end, subgrade settlement, pumping B.3.3 Shrinkage of concrete, Longitudinal expansive base or Full depth repair (slab cracks subgrade, loss of support replacement) from edge pumping Overload, repeated B.3.4 Transverse bending on pumping Cracks slabs, failure of foundation, shrinkage B.3.5 Crocodile Improper load transfer Cracks device, base/subgrade weakness, insufficient slab thickness, settlement of base

Local Road Management Manual - Page 80 Local Road Management Manual Page 79 Page 81